Articles

Practical techniques · Tool applications · Pitfall guides · Case studies · Data analysis · Improvement methods · Audit readiness

Concise, actionable knowledge for solving real problems at work

📄 79 articles in total 📅 Continuously updated 🔥 Pinned first, then sorted by rating, views and publish date
Advanced Quality & R&D Quality · Process Development & Approval · PFMEA

Does Every New Project Start FMEA from Scratch? —— Five Steps to Establish and Reuse Baseline FMEA (Family FMEA)

When a new project is launched, the client demands the PFMEA to be submitted within two weeks. Quality engineers typical…

Advanced Quality & R&D Quality · Design Quality · DVP/DV/PV & Validation Strategy

Advancing QE Skills (24) | Design Verification (DV) and Production Validation (PV): How to Design a Valid Test Plan

A car sensor produced by an electronics manufacturing company was questioned by a customer quality engineer during a new…

Advanced Quality & R&D Quality · Process Development & Approval · Control Plan (CP)

Why Do People Always Fill in "Product Characteristics" and "Process Characteristics" Incorrectly in Control Plans? —— A Five-Step Method to Align the Two Columns

During a customer audit at an automotive parts factory, the auditor pointed to a control plan for a welding process and …

Advanced Quality & R&D Quality · Design Quality · DFMEA

Advancing QE Skills (23) | The Synergy of DFMEA and PFMEA: How Design Changes Affect Processes

A wire harness connector produced by an automotive parts company received a batch of complaints about pin withdrawal in …

Advanced Quality & R&D Quality · Process Development & Approval · PPAP & Process Approval

Customer Grants "Temporary Approval" and Production Lines Go Full Throttle? — Decoding Conditions of PPAP Temporary Approval and the Five-Step Method for Closing the Loop

A certain automotive parts company received a new project. The status column of the PSW read "Temporary Approval Interim…

Advanced Quality & R&D Quality · Advanced Planning · APQP Stage Gates

Advancing QE Skills (22) | APQP from a QE Perspective: What to Deliver at Each Stage and Where to Focus

1. Why Did a "Complete Documentation" APQP Fail on the First Trial Production Run? A new project at an automotive parts …

Advanced Quality & R&D Quality · Process Development & Approval · PPAP & Process Approval

23 Specifications, 23 Sets of PPAP? —— Five-Step Method for Family Part Submission and Representative Part Selection

A hardware supplier provides 23 different specifications of pins to the same customer, with varying hole diameters and l…

Advanced Quality & R&D Quality · Process Development & Approval · Control Plan (CP)

Control Plan Looks Good, but the Shop Floor Still Follows Old Habits? —— Five Steps to Drive Layered Process Audit (LPA) with the Control Plan

A plastic injection molding workshop produces an automotive interior component. The control plan CP is well written: a c…

Advanced Quality & R&D Quality · Design Quality · Special Characteristics & Drawing Specifications

Unannotated on the Drawing Means No Management? —— Five Steps for Identifying and Clarifying Unannotated Requirements

1. A Drawing Without Burr Annotations Led to the Loss of Three Batches of Goods A stamping bracket component of an autom…

Advanced Quality & R&D Quality · Process Development & Approval · PFMEA

Is Your PFMEA Beautifully Written, but the Production Line Doesn't Match? — The Five-Step Method of Reverse FMEA

An auditor from a customer of an automotive parts company stood for five minutes at a welding station and asked two ques…

Advanced Quality & R&D Quality · Process Development & Approval · PFMEA

Replacing RPN with AP: Why Prioritizing Actions Became More Confusing? — Five Steps to Implement FMEA Action Priority

After a car parts factory updated its FMEA, it changed the "RPN" column to the "AP" column. The first cross functional r…

Advanced Quality & R&D Quality · Process Development & Approval · PPAP & Process Approval

PPAP File Package Complete, but the Production Line Can't Keep Up? —— Five Steps for Capacity Verification (Run@Rate)

A certain automotive parts company submitted a PPAP, and the file package passed on the first attempt: 18 items were com…