Resource Overview

Do you need to fill it all out? No. This form only contains management fields; the detailed handling of each issue should still be documented in a nonconforming item corrective action form or an 8D report, and the tracking form links to them via the issue number. The form already has 50 rows and formulas set up, so you can start filling in from there.

Application Guide

1) Read the requirements and common mistakes for the 12 fields on the 'Filling Instructions' page; 2) Keep the example rows on the 'Issue Ledger' page for reference, and start filling in new issues from row 16; 3) The clause number must be filled in (VDA 6.3 question numbers such as P6.1.2 or system clause numbers such as 8.5.1), as it is the basis for annual statistics; 4) For recurring issues, fill in the historical issue number in the 'Recurring Mark' column; 5) Use the drop-down menu for status, and the overdue days will be automatically calculated by the formula; do not fill them in manually.

Pitfall Guide

Do not uniformly write 'Quality Department' as the responsible department (this will hinder issue resolution); do not use 'Corrected' or 'Strengthen Management' as evidence (they will be rejected during verification); do not allow the responsible person to change the status to 'Closed' on their own (it must be signed off by the verifier); the red and yellow light thresholds (7 days for pending analysis, 15 days for pending verification) are default management values, not standard clauses; adjust them according to your company's cycle.